LONGi unveils perovskite solar cell of 33.5% conversion efficiency at Intersolar

Facebook
Twitter
LinkedIn
Reddit
Email
A rare glimpse of the LONGi display containing it’s newly-presented perovskite tandem cell when it’s not surrounded by curious visitors at the Intersolar event in Munich, Germany. Image: Andre Lamberti / Solar Media.

Chinese solar company LONGi has unveiled its latest perovskite/crystalline tandem solar cell at the Intersolar 2023 event in Germany, which boasts a conversion efficiency of 33.5%.

The company’s panel is the second-most conversion-efficient solar cell in the world, and is 1.7% more conversion-efficient than the module shown at the Smart Energy Conference and Exhibition (SNEC) in Shanghai earlier this year. The panel, dubbed “2681” after it recorded a conversion efficiency of 26.81% in November 2022, has a power capacity of 600W.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

The latest efficiency figure was confirmed by the European Solar Test Installation, an EU body, and is the latest impressive milestone for LONGi. Its Taizhou solar plant in China boasts a capacity of 38GW, and attention will likely turn to how the company can best deploy its impressive technology.

“Improving cell conversion efficiency and reducing the cost of electricity remain the perpetual theme driving the development of the photovoltaic industry,” said Li Zhenguo, president of LONGi during a speech at Intersolar. “As a global inclusive energy source, photovoltaic is sending light and well-being to various countries and regions around the world.”

LONGi has invested considerable time and effort into optimising its solar cells, in particular tandem cells, which consist of two solar panels arranged one on top of the other, each optimised to a different part of the spectrum of light. The company has spent US$2.8 billion (CN¥20 billion) on research into solar efficiency, and its work has broken the world record for solar efficiency 14 times since April 2021.

Alongside the 2681 panel, LONGi is demonstrating what it calls a “new tech conceptual product” at Intersolar. This project, which consists of silicon heterojunction cells, could further optimise the company’s solar power generation, and LONGi noted that its “dual-glass structure” means it may be more reliable and scalable than other forms of solar generation.

21 October 2025
New York, USA
Returning for its 12th edition, Solar and Storage Finance USA Summit remains the annual event where decision-makers at the forefront of solar and storage projects across the United States and capital converge. Featuring the most active solar and storage transactors, join us for a packed two-days of deal-making, learning and networking.
10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

April 14, 2025
LONGi has launched the latest version of its Hi-MO 9 module, which now boasts a conversion efficiency of 24.8% and an output of 670W.
April 10, 2025
The State Electricity Commission (SEC), a state-owned energy company in Victoria, Australia, has confirmed that construction has started on the 119MW SEC Renewable Energy Park.
March 14, 2025
Terabase Energy has raised US$130 million in finance to support the scale-up of its Terafab solar project assembly line.
March 10, 2025
The Australian government has released its first National Renewable Energy Priority List, which includes an additional 16GW of renewables.
Premium
March 5, 2025
PV Talk: University of New South Wales professor Xiaojing Hao discusses her hopes for the potential of kesterite, an emerging alternative PV technology.
Premium
March 4, 2025
Canadian Solar and LONGi shared their perspectives on industry pricing, competition, and patent disputes at a recent event in China.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
April 23, 2025
Fortaleza, Brazil
Solar Media Events
April 29, 2025
Dallas, Texas
Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA