China confirms 110GW goal, drops distributed solar target

Facebook
Twitter
LinkedIn
Reddit
Email
The latest plan endorses the proposed target of 110GW by 2020.

China has released its latest five-year plan for the solar industry with a focus on tackling curtailment, improving project quality and further reducing its feed-in tariff.

The latest plan endorses the proposed target of 110GW by 2020 that had previously been released for consultation by the country’s National Energy Administration (NEA). The government has ceased to include a separate, specific target for distributed generation (DG) projects, in an apparent change of tactics. Concentrated solar power (CSP) will represent 5GW of this figure.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Grid pressures have forced the curtailment of production from some sites with western provinces impacted particularly heavily. Under the new five-year plan, 11 provinces, largely but not exclusively in the east, have been assigned preferential status for solar deployment.

The 110GW figure is a 20% reduction on the original 150GW target. Frank Haugwitz is a Beijing-based expert on PV and renewable energy in China and founder of the Asia Europe Clean Energy Advisory (AECEA). He maintains that the 110GW figure is likely a low bar to be cleared rather than a high, aspirational target. Previous targets have been far-exceeded, Haugwitz has noted.

In what AECEA referred to as a “surprise” announcement, a carve-out in that target for DG installs has been abandoned. Beijing continues to support DG projects and a network of DG energy demonstration zones will be established with a target to install solar on 50% of all rooftops and 80% of new buildings.

10 March 2026
Frankfurt, Germany
The conference will gather the key stakeholders from PV manufacturing, equipment/materials, policy-making and strategy, capital equipment investment and all interested downstream channels and third-party entities. The goal is simple: to map out PV manufacturing out to 2030 and beyond.

Read Next

April 24, 2025
Leading Chinese firm DAS Solar has started construction at a 3GW module manufacturing facility in Mandeure, France, its first in Europe.
April 24, 2025
Lee Zhang of Sungrow reveals how the company's new inverter meets the needs of the rapidly evolving solar and storage industries.
Premium
April 23, 2025
The latest polysilicon pricing report from the Silicon Industry Branch reveals a lukewarm spot market with modest price drops.
Premium
April 23, 2025
Analysis: Carrie Xiao explores the factors behind the recent cancellation of China’s PV module mega-tender and their wider implications for equipment procurement.
April 23, 2025
Shanghai Electric and Masdar have signed an agreement to build the 2GW Sadawi solar project in Saudi Arabia.
Premium
April 22, 2025
Solar’s rapid expansion has attracted the attention of those opposed to its ongoing success, writes Becquerel Institute CEO Gaëtan Masson.

Subscribe to Newsletter

Upcoming Events

Solar Media Events
April 29, 2025
Dallas, Texas
Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA
Solar Media Events
July 1, 2025
London, UK