India’s SECI tendering 650MW for Kadapa Solar Park in Andhra Pradesh

Facebook
Twitter
LinkedIn
Reddit
Email
Capacity is split into 500MW open category and 150MW under Domestic Content Requirement (DCR) rules. Flickr: Pranav

The Solar Energy Corporation of India (SECI) has issued a request for selection (RfS) for 650MW of grid-connected solar PV projects at the Kadapa Solar Park in Andhra Pradesh.

The capacity, which is split into 500MW open category and 150MW under Domestic Content Requirement (DCR) rules, comes under the National Solar Mission, phase II, batch IV.

This article requires Premium SubscriptionBasic (FREE) Subscription

Unlock unlimited access for 12 whole months of distinctive global analysis

Photovoltaics International is now included.

  • Regular insight and analysis of the industry’s biggest developments
  • In-depth interviews with the industry’s leading figures
  • Unlimited digital access to the PV Tech Power journal catalogue
  • Unlimited digital access to the Photovoltaics International journal catalogue
  • Access to more than 1,000 technical papers
  • Discounts on Solar Media’s portfolio of events, in-person and virtual

Or continue reading this article for free

Last March, Indian state-owned utility NTPC also issued an RfS for solar developers to set up a 250MW solar PV project in the Kadapa Solar Park.

Read Next

April 10, 2025
India has added 11.6GW and 25.3GW of annual nameplate capacity in 2024 for solar cells and PV modules, respectively.
April 9, 2025
Indian solar manufacturer Inox Solar has secured a land agreement with the Odisha government to build a solar cell and module assembly plant.
April 3, 2025
India’s open access market has the potential to offer 20GW of solar PV to power the country’s heavy industries, according to a report from think tank Ember.
April 3, 2025
US President Donald Trump has announced sweeping global tariffs on imports to the US, which have heavily impacted major solar PV manufacturing regions.
April 2, 2025
India has nearly trebled its annual nameplate for solar cells from 9GW to 25GW between March 2024 and March 2025, according to the Ministry of New and Renewable Energy (MNRE).
March 31, 2025
Waaree Energies has commissioned a 5.4GW cell manufacturing facility in Gujarat, the largest cell manufacturing facility in India.

Subscribe to Newsletter

Upcoming Events

Media Partners, Solar Media Events
April 23, 2025
Fortaleza, Brazil
Solar Media Events
April 29, 2025
Dallas, Texas
Media Partners, Solar Media Events
May 7, 2025
Munich, Germany
Solar Media Events
May 21, 2025
London, UK
Solar Media Events
June 17, 2025
Napa, USA